Our expertise in studies and field surveys provides the solid foundation needed for a successful deployment project by assessing the constructibility of the targeted area.

Through a rigorous approach, we present multiple route scenarios, each accompanied by a comprehensive evaluation of advantages, constraints, and associated costs.

This comparative analysis leads to the selection of the optimal route, one that maximizes success while meeting technical and budgetary requirements. The final report also includes detailed maps of the selected route or routes, offering a clear and actionable view for the next phases of the project.

Studies and Surveys

Our services

YRH supports companies like yours with the following services:

  • Field surveys with photos
  • Scenario planning
  • Possible routes and solutions
  • Required rights of way
  • Identification of key issues and risks
  • Engagement with telecommunications providers who may offer partnership potential
  • Preliminary report for comments with a cost estimate for the most realistic scenario

From analysis to mapping, YRH provides you with a clear vision to guide your strategic decisions and ensure the success of your FTTH networks.

Achievements

Partial list of our recent achievements in studies and surveying.

Eeyou Communication Network

Fiber optic link between Terrebonne and Anjou

Feasibility study to determine the optimal fiber‑optic route between the Judith‑Jasmin substation in Terrebonne and the Cologix data center in Ville d’Anjou, along with detailed engineering to interconnect the two identified points. The 30‑km network crosses several major obstacles, including Highway 640, the Mille‑Îles and Prairies rivers, and requires the use of the Highway 25 bridge.

Bulk Infrastructure

Study and pre-engineering – 1800 km Fiber Optic Cable between Labrador and Quebec

Feasibility study and pre-engineering for the Leif Erikson fiber optic cable buried 1,800 km between Happy-Valley – Goose Bay (Labrador) and Montreal (Quebec)

Hydro-Quebec

Study and route survey for the Churchill–Montagnais corridor

Study and surveys to assess the feasibility of installing a new fully buried fiber‑optic link between the Montagnais substation and a future interconnection point located at Ross Bay Junction in Labrador or near Fermont. The project covers approximately 150 km of terrestrial and subsea infrastructure. Due to the northern location, the study required consideration of several constraints such as permafrost, high wildfire risk, involvement of Indigenous communities, environmental ministry requirements, and the presence of forest roads and railway crossings.

Discover our specializations related to FTTH and Outside Plant